Skip to content
01Bathrooms & wet roomsWest London

Bathroom fitters
in West London.

We take a bathroom from strip-out to hand-over: the plumbing, the tanking, the tiling, the electrics and the second fix. Most people find us through these rooms, and most of the photographs on this site are them.

Family bathroom fitted in Notting Hill W11
01Family bathroom, W11 — Calacatta-effect porcelain floor to ceiling, matt black brassware, wall-hung sanitaryware.
Rooms
Bathrooms, shower rooms, wet rooms, cloakrooms
Held in-house
Plumbing, tanking, tiling, joinery
Covering
West & Central London
Based
Notting Hill,W11
02What the job involves

The tiling is the last week of the work.

A bathroom is a plumbing job and a waterproofing job wearing a tiled finish. The visible part takes a few days at the end. What takes the time is getting the services where they need to be, sealing the wet walls, and setting the falls so water leaves the room.

  • Full strip-out back to brick or stud, and disposal
  • Moving hot, cold and waste to the new layout
  • Metal stud, boarding and concealed cistern frames
  • Tanking and waterproofing to every wet area
  • Falls set to the drain before any tile is cut
  • Large-format porcelain, natural stone and mosaic
  • Level-access wet rooms and linear drains
  • Screens, brassware, wall-hung WCs and vanities
  • Backlit niches, mirrors, extraction and underfloor heating
Tanked bathroom wall with adhesive combed ready for tiling
02Tanked, then tiled — The wet wall sealed and primed, adhesive combed ready for large-format tile.
Concealed thermostatic shower valve and linear drain set flush with the tile
03Valve and drain — Concealed thermostatic valve, linear drain set flush with the finished tile.
03Behind the tiles

We photograph it before it gets covered up.

Tanking, pipe runs, fixings behind the plasterboard: you can see all of it for about a week, and then never again. We take pictures of that stage on every bathroom and hand them over at the end, so there is a record of what is behind the tiles.

Before
First fix plumbing: metal stud, concealed cistern frame and pipe runs
04First fix — Metal stud, concealed cistern frame, hot and cold runs, waste and soil set out.
After
Finished bathroom with fitted vanity run and level-access shower
05The same room, finished — Stone-effect porcelain, fitted vanity run, level-access shower.
Before
Bath cradled and panelled against tanked walls, ready for tiling
06Bath set and boarded — Tanked walls, bath cradled and panelled ready for the tiler.
After
Finished bathroom with the original sash window retained
07Handed back — Original sash retained, full-height tiling, fitted furniture run.
04Finished rooms
Level-access wet room with linear drain and backlit niche
08Wet room — Level access, linear drain, tiled seat, backlit niche and a frameless screen.
Shower room with Crittall-style screen and backlit mirror
09Shower room, W11 — Crittall-style screen, backlit mirror, countertop basin on a stone shelf.
Walk-in shower room in marble-effect porcelain with a black rainfall shower and a lit recess shelf
10Marble-effect shower room — Walk-in tray, black rainfall set and a lit recess shelf running the wall.
Wide view of a shower room with Crittall-style enclosure
11The same room, wide — Crittall-style enclosure, concealed niche lighting, wall-mounted brassware.
Bath with a black framed screen against book-matched marble-effect porcelain
12Bath and screen — Black framed screen; wall and floor tile book-matched through the room.
05Where we fit themWest & Central London

Bathrooms across West London.

We are ten minutes from most of West London and work daily in the stucco terraces of Notting Hill and Bayswater, the mansion blocks of Kensington, and the bay-fronted Victorian houses of Hammersmith and Fulham.

06Questions we get asked

Bathrooms, answered plainly.

What does a bathroom refit actually involve?

Strip out back to brick or stud, move the plumbing and electrics to the new layout, board and tank the wet walls, set the falls to the drain, tile, then second fix the brassware, screens and sanitaryware. The tanking and the falls are the parts that decide whether the room is still sound in ten years.

What is tanking, and do I need it?

Tanking is a waterproof layer applied to the walls and floor of the wet area before any tile goes on. Tile and grout are not waterproof on their own. Any shower area or wet room needs it, and we photograph ours before it is covered.

Can you do a level-access wet room in a flat?

Usually, but it depends on the floor build-up and where the existing waste runs. That is one of the things we check on the visit, because it is not something anyone can answer from a photograph.

How long will it take?

It depends on the size of the room and what we find behind the walls, which is why we do not guess down the phone. The quote comes with the running order, week by week, so you know which trade is in when and what you have to have chosen by then.

Can you give me a price over the phone?

A range, yes. A written price, no — not until we have seen the room. Send a photo and your postcode on WhatsApp and we will tell you the ballpark and whether it needs a visit. The itemised quote follows the visit.

Do you cover my postcode?

We are based in Notting Hill W11 and work across West and Central London: W2, W4, W5, W6, W8, W9, W10, W11, W12, SW1, SW3, SW6, SW10, NW6 and NW10. If you are just outside that, call anyway — for bigger contracts we travel further.

07Get in touchNotting Hill · W11

Tell us what needs doing.

Quickest is a phone call, or a WhatsApp with a couple of photos and your postcode. Ahmad answers the phone himself.

Call now